Edwards remodel contracting removed Amanda’s vanity, flooring, shower and tub. We built a custom shower. A deep undermount tub with stone
top was installed. E.R.C installed 12×24 tiles on the floor and four feet up the walls. Subway tile were installed vertical the rest of the way. A new vanity, mirror and sconce light was installed. I was very happy with the finished product of this bathroom renovation.